Controlled Upgrade of Existing Infrastructure

This project involved the removal of existing pipework and the installation of a new skid and associated pipework within a live industrial environment. The works required careful planning and sequencing to ensure existing systems were safely isolated, removed, and replaced without unnecessary disruption.

All works were carried out on site by the Kee Engineering team, from initial strip-out through to final installation.

Project Overview

Scope of works included:

  • Strip-out and removal of existing pipework
  • Installation and positioning of a new skid
  • Installation of new pipework runs
  • Connection to existing tanks, pumps, and systems

The objective was to replace ageing infrastructure with a cleaner, more robust layout, improving reliability and ease of future maintenance.

Pipework and Installation Works

Following the removal of the old pipework, the new skid was installed and secured in position. New pipework was then fabricated and installed to suit the existing layout, with careful attention paid to alignment, access, and support.

Works included:

  • New pipe routes installed to suit site constraints
  • Installation of valves and flanged connections for isolation and control
  • Secure mounting and support of pipework to maintain long-term integrity
  • Integration with existing equipment without unnecessary modification

All pipework was finished to provide a consistent, durable installation suitable for an external industrial environment.

Challenges and Solutions

Working within an established site meant navigating existing assets, limited access areas, and live systems. By stripping out redundant pipework first and installing the new skid as a defined assembly, the installation could progress efficiently and in a controlled manner.

Careful routing and support design ensured the new pipework integrated cleanly with the existing layout while improving overall system organisation.

Final Result

The completed works delivered:

  • Removal of outdated pipework
  • A newly installed skid is positioned and connected to existing systems
  • New pipework installed, supported, and ready for ongoing operation

The site now benefits from a more streamlined and maintainable pipework arrangement, installed with minimal disruption and explicit consideration for future access.

Reliable Industrial Pipework Solutions

This project highlights Kee Engineering’s practical, on-site capability in managing pipework upgrades and skid installations within live environments. From strip-out to final connection, our team delivers clear, well-executed engineering solutions built around real site conditions.

Gallery

More To Explore

We use cookies to give you the best online experience. By agreeing, you accept the use of cookies in accordance with our cookie policy. If you do not accept cookies, our website may not display or function correctly.

Privacy Settings saved!
Privacy Settings

When you visit any web site, it may store or retrieve information on your browser, mostly in the form of cookies. Control your personal Cookie Services here.

These cookies are necessary for the website to function and cannot be switched off in our systems.

In order to use this website we use the following technically required cookies
  • wordpress_test_cookie
  • wordpress_logged_in_
  • wordpress_sec

Decline all Services
Accept all Services