Pipe Fabrication

Loading Arm Cabinet Fabrication and Site Installation – Cumbria

Precision Fabrication, Built In-House This project demonstrates Kee Engineering’s ability to deliver complete fabrication and on-site installation works within a live industrial environment. The scope extended beyond cabinet manufacture alone, incorporating new pipework runs, break-ins, welding, and final integration with existing fuel infrastructure. By controlling both workshop fabrication and site installation, we ensured accuracy, efficiency, […]

Loading Arm Cabinet Fabrication and Site Installation – Cumbria Read More »

Pipework Strip-Out, Skid Installation and New Pipework

Controlled Upgrade of Existing Infrastructure This project involved the removal of existing pipework and the installation of a new skid and associated pipework within a live industrial environment. The works required careful planning and sequencing to ensure existing systems were safely isolated, removed, and replaced without unnecessary disruption. All works were carried out on site

Pipework Strip-Out, Skid Installation and New Pipework Read More »

6” Gas Main Fabrication and Integration to Existing Pipework

This project involved the fabrication and installation of a new 6” gas main to supply a new gas booster, tying directly into pre-existing pipework. While installing new pipework in isolation is straightforward, integrating into an existing system presents a different set of challenges – particularly where layout, elevations, and fixed connection points cannot be altered.

6” Gas Main Fabrication and Integration to Existing Pipework Read More »

Loading Arm Extension & Pipework Installation – Hungerford

This project demonstrates Kee Engineering’s ability to integrate new equipment into existing fuel handling infrastructure while maintaining accuracy, control, and safe working practices throughout. Working with pre-installed systems is rarely straightforward, particularly in operational loading areas. Still, careful planning and disciplined execution ensured the work was completed efficiently and without unnecessary disruption. Project Overview Three

Loading Arm Extension & Pipework Installation – Hungerford Read More »

We use cookies to give you the best online experience. By agreeing, you accept the use of cookies in accordance with our cookie policy. If you do not accept cookies, our website may not display or function correctly.

Privacy Settings saved!
Privacy Settings

When you visit any web site, it may store or retrieve information on your browser, mostly in the form of cookies. Control your personal Cookie Services here.

These cookies are necessary for the website to function and cannot be switched off in our systems.

In order to use this website we use the following technically required cookies
  • wordpress_test_cookie
  • wordpress_logged_in_
  • wordpress_sec

Decline all Services
Accept all Services