The installation of new load skids and pipework has been undertaken by Kee Engineering at a facility located in Thatcham.
Kee Engineering previously stripped out an old top-load arrangement from a site in Thatcham. After stripping out the previous top-load equipment along with the access platform, the site was prepared for the construction of the new installation.
After completing the demolition works, our team constructed a new load skid as well as all necessary piping, bracing, and bracketry to provide the complete configuration of the new installation.
Project Description
Works Included:
- Stripping down of the existing top-load assembly
- Removing of the previous access platform
- Constructing and installing the new load skid
- Installations of the associated piping
- Construction and installation of pipe supports and bracketry
- Connecting the new installation to the existing site infrastructure
Installation had to occur within the confines of the existing structural/operational arrangement. This included routing and supporting the pipework through the site infrastructure that is available.
This project illustrates how Kee Engineering can combine equipment removal, industrial piping installations, fabricating and field engineering into one package of work.
Industrial Pipework and Site Engineering Support
Kee Engineering can offer practical engineering assistance for industrial piping installations, upgrading equipment, modifying equipment on active industrial sites.
Our staff are able to assist with projects including workshop fabricating, on-site installation, coded welding, steel fabrication and other forms of engineering works.
If you have any questions regarding industrial piping or field engineering please do get in contact.