Pipe Fabrication

Loading skid with pumps and pipework beside large green cabinets

Loading Skid, Offloading Cabinet and Pipework Installation – Isle of Mull

Kee Engineering recently carried out a mechanical installation project on the Isle of Mull, involving the installation of a new offloading cabinet, loading skid and associated pipework. The project required a combination of pipework fabrication, mechanical installation and on-site fitting, with the team responsible for installing the connecting pipework and supporting bracketry around the existing

Loading Skid, Offloading Cabinet and Pipework Installation – Isle of Mull Read More »

Workers in high-visibility clothing install large red pipes inside a building under construction.

Mechanical Pipework Installation – Kettering General Hospital Energy Centre

Kee Engineering is continuing to make strong progress at Kettering General Hospital, carrying out the mechanical installation within the hospital’s new Energy Centre. This stage of the project has involved the installation of substantial large-bore pipework throughout the building, with prefabricated sections being carefully lifted, positioned and secured within the developing mechanical infrastructure. It is

Mechanical Pipework Installation – Kettering General Hospital Energy Centre Read More »

Bulk Storage Tank Access and Pipework Installation at Leeds Bradford Airport

Kee Engineering is currently undertaking a large scale installation project at Leeds Bradford Airport which involves the construction of two bulk storage tanks along with the associated access systems and piping systems. The first part of this installation project was the construction of walkways, ladders for access and the installation of new inspection hatch and

Bulk Storage Tank Access and Pipework Installation at Leeds Bradford Airport Read More »

Bespoke On-Site Access Platform Fabrication

Kee Engineering designed and fabricated a custom-built access platform to give workers a safer route around current equipment. The platform was built on-site as per the available area, the installed equipment and the clients needs/requirements. Project Description Works Included: Measurement and Planning On-Site Designing and Fabricating the Custom-Made Access Platform Creating the Steel Support System

Bespoke On-Site Access Platform Fabrication Read More »

Stainless Steel Pipework Installation for Mixing Vessels in Dudley

Kee Engineering carried out fabrication work and pipework at a manufacturing plant in Dudley to support the fit-out of four stainless steel tanks. Works included the site-welding of stainless-steel pipework to connect the tanks and the installation of screwed (screw-in) pipework for steam supply and condensate return. Project Description Works Included: Stainless Steel Pipework Welding

Stainless Steel Pipework Installation for Mixing Vessels in Dudley Read More »

Loading Arm Cabinet Fabrication and Site Installation – Cumbria

Precision Fabrication, Built In-House This project demonstrates Kee Engineering’s ability to deliver complete fabrication and on-site installation works within a live industrial environment. The scope extended beyond cabinet manufacture alone, incorporating new pipework runs, break-ins, welding, and final integration with existing fuel infrastructure. By controlling both workshop fabrication and site installation, we ensured accuracy, efficiency,

Loading Arm Cabinet Fabrication and Site Installation – Cumbria Read More »

Pipework Strip-Out, Skid Installation and New Pipework

Controlled Upgrade of Existing Infrastructure This project involved the removal of existing pipework and the installation of a new skid and associated pipework within a live industrial environment. The works required careful planning and sequencing to ensure existing systems were safely isolated, removed, and replaced without unnecessary disruption. All works were carried out on site

Pipework Strip-Out, Skid Installation and New Pipework Read More »

6” Gas Main Fabrication and Integration to Existing Pipework

This project involved the fabrication and installation of a new 6” gas main to supply a new gas booster, tying directly into pre-existing pipework. While installing new pipework in isolation is straightforward, integrating into an existing system presents a different set of challenges – particularly where layout, elevations, and fixed connection points cannot be altered.

6” Gas Main Fabrication and Integration to Existing Pipework Read More »

We use cookies to give you the best online experience. By agreeing, you accept the use of cookies in accordance with our cookie policy. If you do not accept cookies, our website may not display or function correctly.

Privacy Settings saved!
Privacy Settings

When you visit any web site, it may store or retrieve information on your browser, mostly in the form of cookies. Control your personal Cookie Services here.

These cookies are necessary for the website to function and cannot be switched off in our systems.

In order to use this website we use the following technically required cookies
  • wordpress_test_cookie
  • wordpress_logged_in_
  • wordpress_sec

Decline all Services
Accept all Services